3-5-ETS1-3 Engineering Design |
||||||||||||||||||
Students who demonstrate understanding can:
|
||||||||||||||||||
The performance expectation above was developed using the following elements from the NRC document A Framework for K- 12 Science Education: | ||||||||||||||||||
Science and Engineering PracticesPlanning and Carrying Out Investigations |
Disciplinary Core IdeasETS1.B: Developing Possible SolutionsETS1.C: Optimizing the Design Solution |
Crosscutting Concepts |
||||||||||||||||
Connections to 3-5-ETS1.B: Developing Possible Solutions Problems include: Fourth Grade: 4-ESS3-2Connections to K-2-ETS1.C: Optimizing the Design Solution include: Fourth Grade: 4-PS4-3 |
||||||||||||||||||
Articulation of DCIs across grade-levels: K-2.ETS1.A ; K-2.ETS1.C ; MS.ETS1.B ; MS.ETS1.C |
||||||||||||||||||
Common Core State Standards Connections:
|
3-5-ETS1-3 Engineering Design |
||||||||||||||||||
Students who demonstrate understanding can:
|
||||||||||||||||||
The performance expectation above was developed using the following elements from the NRC document A Framework for K- 12 Science Education: | ||||||||||||||||||
Science and Engineering PracticesPlanning and Carrying Out Investigations |
Disciplinary Core IdeasETS1.B: Developing Possible SolutionsETS1.C: Optimizing the Design Solution |
Crosscutting Concepts |
||||||||||||||||
Connections to 3-5-ETS1.B: Developing Possible Solutions Problems include: Fourth Grade: 4-ESS3-2Connections to K-2-ETS1.C: Optimizing the Design Solution include: Fourth Grade: 4-PS4-3 |
||||||||||||||||||
Articulation of DCIs across grade-levels: K-2.ETS1.A ; K-2.ETS1.C ; MS.ETS1.B ; MS.ETS1.C |
||||||||||||||||||
Common Core State Standards Connections:
|